bionpicks.blogg.se

No vstack cisco router
No vstack cisco router







no vstack cisco router
  1. #No vstack cisco router install
  2. #No vstack cisco router software
  3. #No vstack cisco router series

Image flash.tarĬonfig flash:smartinstall_config_2960c.txt

#No vstack cisco router software

Table A-4 Minimum Software Releases for Clients

#No vstack cisco router series

Table A-3 Minimum Software Releases for Directors and ClientsĬatalyst 4500 Supervisor Engine 7E and 7LEĬatalyst 4500 Supervisor Engine 6K and 6LEĬisco 3900, 2900, and 1900 Series Integrated Services Routers G2Ĭisco 3800, 2800, and 1800 Series Integrated Services RoutersĬatalyst 3750-E, 3750, 3560-E, and 3560 Switches

  • If you want to verify the supported clients on the director use this command “show stack group built-in ?”Ĭatalyst 4500 Supervisor Engine, 6E, 6LE, 7E, 7LEĬisco 3900 Series Integrated Services Routers G2Ĭisco 2900 Series Integrated Services Routers G2Ĭisco 1900 Series Integrated Services Routers G2Ĭisco 3800 Series Integrated Services RoutersĬisco 2800 Series Integrated Services RoutersĬisco 1800 Series Integrated Services Routers.
  • tar format for the images worked the best. This process takes time (sometimes up to an hour).
  • Be patient while the image is loaded to the client.
  • I found that 2GB on the 3650/4500x was suffice for my customer. If you have many different PIDs, your going to need more flash.
  • Make sure your director device has plenty of flash memory to store the images and configs.
  • This is how I configured it in the example inline.
  • TFTP and DHCP services are required, however they can co-reside on the director.
  • Just make sure the VLAN has at lease one access port up/up if using that SVI for the director.

    #No vstack cisco router install

  • If using an 元 switch for director the smart install “vstack” VLAN must be up or the director can fallback to a client role.
  • Out of the box, no intervention required.
  • If a client switch was already deployed, you must “wr erase” and reload without a startup-config for smart install to work.
  • Clients connect to director and pull down image and config without any intervention (ZTD).
  • Director can be an multilayer switch or router.
  • Two roles for the switch infrastructure “clients” & “director”.
  • You can ship a switch to a location, place it in the network and power it on with no configuration required on the device.
  • Smart Install is a plug-and-play configuration and image-management feature that provides zero-touch deployment (ZTD) for new switches.
  • You can read up on all the details, but let me summarize a few key points. I used this as a basis for design and configuration. At the end of 2014, we put out an updated configuration guide for smart install. One of those bullet points was smart install and I remember this for the 3750x as well.

    no vstack cisco router

    Since the launch of the 3850/3650 access layer switches, we had slides that mentioned all the value add features of the Catalyst line. I had two viable solutions to match these requirements 1) Prime Infrastructure Plug & Play 2) Smart Installĭue to a recent PSIRT regarding Smart Install Protocol Misuse, it’s recommended to following this security best practices guide when deploying Smart Install. The basic requirements were a standardized image depending on the platform and initial config for access switches. They are somewhat limited on networking personal and this would save the team some time if they could automate the staging of switches before deployment. Overview:Ī global company asked me if there was an easy way to provision switches for rapid deployment. Take a technology that I’m working on with a customer and post the data points. This is my first post in a new series called “Config Bytes”.









    No vstack cisco router